CP Control Panel
PRODUCT DESCRIPTION:
LEAD TIME:
Lead-times and expedites
Lead-times apply to standard parts & configurations. Expedited shipments available by contacting factory. Lead-times may vary based on quantity and/or non-standard configurations.
FEATURED DOWNLOADS:
Features
- NEMA-1 Enclosure - General Purpose
- NEMA-4 Enclosure - Water Resistant
- NEMA-4X Enclosure - Corrosion and Water Resistant
- Optional Equipment - Visual Alarms; High & Low Audible/Silent Alarms; Hand-off Auto Switches
- General Industry
- General Industry - Alarm Panels
- General Industry - Environmental
- General Industry - Other
- General Industry - Tanks
- HVAC/R - Cooling Towers
- HVAC/R - General HVAC
- HVAC/R - Other
- HVAC/R - Warrick
- HVAC/R Equipment
- Process Applications
- Waster Water Applications
- Water & Waste Water - Flood Level Monitoring
- Water & Waste Water - Groundwater Monitoring
- Water & Waste Water - Industrial Water Treatment
- Water & Waste Water - Other
- Water & Waste Water - Pumps
- Water & Waste Water - Water Distribution
The sensitivity of the control should be greater than the resistance of the liquid.